DEVELOPMENT CONSTRUCTIONS LTD.         FOUNDATION CONSULTANTS LTD.


 

CONSTRUCTION PROJECTS WE HAVE COMPLETED                                                                                                            

 

A.        FLYOVER:

 

A1.      Employer                                 :           LOCAL GOVERNMENT ENGINEERING

DEPARTMENT.

 

            Principal Contractor                :           Development Constructions Ltd.

 

            Project :                                   :           Design Build Contract of Flyover at Khilgaon Rail

& Road Intersection, Length 1880m with 4 lane carriage way, in Dhaka City.

 

            Contract value                         :           Tk. 627.00 Million

           

 

            Contract period                       :           23/06/2001 to 31/12/2004.

 

 

 

B.        HIGHWAY BRIDGE:

 

B1.      Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

            Principal Contractor                :           HANIL CONSTRUCTION CO LTD.

 

Project                                     :           Construction of 450m long pre-stressed concrete

girder bridge (10 span of 45m) on 1m diameter, 57m long bored cast-in-situ R.C.C piles over River Arial khan at SRNDP, Contract No.-2, Mawa

(Char Janajat) - Bhanga including manufacture and driving of 47 m long 12 mm thick permanent steel casing.

 

            Contract value                         :           27,49,42,486.00 Tk. (Including cost of materials)                                                                             

Contract period                       :           January 2001 to January 2005.

 

 

 

 

 

 

 

B2.      Employer                                 :           ROAD AND HIGHWAYS DEPARTMENT

 

            Principal Contractor                :           TOWER ENTERPRISE LTD.

 

Project                                     :           Construction of 303.25 m long Pre-Stressed

                                                            concrete girder Bridge –at Mollahat over

                                                            Modhumoti River on Bhanga-Bhatiapara

                                    Gopalgonj-Mollahat Fakirhat-Tower Noapara-Khulna Road , Under Gopalgonj Road Division,

                                    Roads & Highways Department works comprising    

                                   

(1)        1000 mm dia 34 m long, 44 Nos. Bored Cast

            in Situ R.C.C pile.

(2)        1200 mm dia 48m long, 72 Nos. Bored Cast –in-Situ R.C.C pile, off –shore at 16 m water

(3)        43.32 m long 2.286 m. height 35 Nos. Pre-

            Stressed  Post Tensioning Girder.

 

            Contract Value                        :           2,20,00,000/- (Excluding cost of materials)

                                                                                                (30% completed)

 

            Contract Period                       :           21-11-98 to 20/06/2000

 

            Completion Date                     :           15.06.2000

 

B3.      Employer                                 :           CHINA HARBOUR ENGINEERING

CONSTRUCTION CO.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

            Project                                     :           Constructions of Contract No. – 3, Atrail &

Ayermari Bridge at Nalkha-Hatikamrul Bonpara New Road Project RRMP-III, Natore.

 

            Contract Value                        :           Tk. 117,833,486/-

 

            Contract Period                       :           15/03/99 to 31/03/2000.                                 

 

            Completion Date                     :           30.03.2000.

 

B4.    Employer                                   :           ROAD AND HIGHWAYS DEPARTMENT .

                                               

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of 92.96 m long Pre-Stressed concrete

                                                            girder Bridge on River Ghagor at 20 the K.M. of

Gopalgonj – Kotalipara-Paisarhat Road, Gopalgonj.            

Contract value                         :           Tk 2,76,24,165/55-

           

            Contract period                       :           14-07-97 to 28-02-99.

            Completion Date                     :           20-02-99.                                                                    

B5.      Employer                                 :           ROADS & HIGHWAYS DEPARTMENTS.

 

            Principal Contractor                :           SUNGJEE CONSTRUCTION CO. LTD.

 

            Project :                                   :           Construction of 188 Nos. 600 mm & 750 dia, Bored

                                                                        Cast-in-Situ pile for Str. No 68,69,70 & 72 at

                                                                        Jamuna Bridge Project, Contract No-3

 

            Contract value                         :           Tk. 60,00,000/00 (Excluding cost of materials)

 

            Contract period                       :           20/02/99 to 20/06/99

 

            Completion Date                     :           20.06.99

 

B6.     Employer                                  :           ROADS & HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           IRCON INTERNATIONAL

 

Project                                     :           Construction of 40 m long Kansat Canal Bridge at

                                                            Ch. 21+735 Sonamasjid- Shibganj-Nawabganj

                                                            Road (RRMP-II /WA)

             

            Contract value                         :           Tk 3,250,370.00

           

            Contract period                       :           05/12/97 to 05/06/98

 

B7.      Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           ANSAL PUBALI JOINT –VENTURE.

 

Project                                     :           Construction of 65.67 m long Road Bridge super

                                                            Structure with Pre-stressed concrete girders, R.C.C

                                                            deck-slab, R.C.C. cross-beam, railing, approach

                                                            slab, guide wall, piers and abutment,

 

Owner                                                 :           Roads & Highway Department.

 

            Contract value                         :           Tk.12,045,648-

 

            Contract period                       :           Dec. 93 to Dec. 1994.

 

B8.      Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           CHINA NATIONAL COMPLETE PLANT

EXPORT CORPORATION.IN DAWLATDIA-FARIDPUR-JHENAIDAH-KUSTIA ROAD.                                          

Project                                     :           Construction of 69.4 m Long Bridge with

                                                            pre-stressed concrete girders on 1.2 m diam 36m

                                                            long bored Cast-in-Situ pile foundation in RIP,

                                                            Contract-11, Jhenaidah (Structure No.46).

                       

            Owner                                     :           Roads and Highways Department.

 

           

Value of Completed work.     :           Tk. 21,620,003/00

            Contract Period                       :           April 1992 to 15th Sept, 1994.

 

Date of completion                 :           28.08.1994.

 

B9.       Employer                                :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           CHINA NATIONAL COMPLETE PLANT

EXPORT CORPORATION. IN DAWLATDIA-

FARIDPUR-JHENAIDAH-KUSTIA ROAD.

 

Project                                     :           Construction of 58 m Long Bridge with

                                                            pre-stressed concrete girders on 500 mm diam 22 m

                                                            long bored Cast-in-Situ pile foundation in RIP,

                                                            Contract-9, Faridpur (Structure No.20).

 

            Owner                                     :           Roads and Highways Department.

           

Value of Completed work.     :           Tk. 18,281,832/00

 

            Contract Period                       :           April 1992 to 15th June 1994.

 

Date of completion                 :           28.08.1994.

 

B10.     Employer                                :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           ACF- SWEEHONG JOINT VENTURE.

 

Project                                     :           Construction of Bored Cast –in-Situ R.C.C. Piles

                                                            (Rake & Vertical) Road Bridge under RIP, Contract

                                                            -4 (Dohazari-Lohagara Section). 

 

Type of Foundation                :           Bored Cast –in-Situ R.C.C. piles, R.C.C. Abutment,

                                                            piers, girders, deck slab, railing.

 

            Contract value                         :           Tk. 25 million.

 

            Year of completion                 :           October 1993 to- June 1993.

 

B11.    Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           CHINA NATIONAL COMPLETE PLANT

EXPORT CORPORATION. IN DAWLATDIA-

FARIDPUR-JHENAIDAH-KUSTIA ROAD.

 

Project                                     :           Construction of 58 m Long Bridge with

                                                            pre-stressed concrete girders on 500 mm diam 22 m

                                                            long bored Cast-in-Situ pile foundation in RIP,

                                                            Contract-9, Faridpur (Structure No.16).

 

            Owner                                     :           Roads and Highways Department.

           

Value of Completed work.     :           Tk. 15,858,432/00

 

            Contract Period                       :           April 1992 to 15th June 1993.

Date of completion                 :           15.06.1993.

 

B12.    Employer                                 :           DIRECTORATE OF RELIEF AND

REHABILITATION. DHAKA, BANGLADESH.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of 280’-0” Long Bridge over the

                                                            River Mathabanga on Chudanga- Alamdanga Road. 

 

Type of Foundation                :           Bored Cast –in-Situ R.C.C. piles, R.C.C. Abutment,

                                                            piers, girders, deck slab, railing.

 

            Contract value                         :           Tk. 7.142 million.

 

            Year of completion                 :           January 92 to July 1993.

 

Execution period                     :           September 1990 to March 1992.

 

B13.    Employer                                 :           ROADS & HIGHWAY DIRECTORATE.

 

Principal Contractor                :           RDC-TPL, SINGAPORE.

 

Project                                     :           5 Nos. Bridge sub-structure on Shambugonj-

                                                            Haluaghat Highway under FRIP, 9 ADB

                                                            financed. Span 20 m to 77 m.

 

Type of Foundation                :           Pre-stressed concrete girders R.C.C. Slab, Pre-Cast

                                                            and cast-in-situ R.C.C piles.

 

            Contract value                         :           Tk. 46.09 million.

 

            Year of completion                 :           1992

 

Execution period                     :           September 1990 to March 1992.

 

B14.    Employer                                 :           ROADS & HIGHWAY DIRECTORATE.

 

Principal Contractor                :           INDIAN RAILWAY CONSTRUCTIONS LTD.   

 

Project                                     :           16.5 m long bridge at 4.15 and 9.15 Km Dhaka-

                                                            Chittagong Highway (Dawoud Kandi-Comilla

                                                            Section).

 

Type of Foundation                :           500 mm diameter 18 m long bored cast –in-situ

                                                            R.C.C. (Rake) piles R.C.C girders, deck slab.

                                                            crush barrier, railings,

 

            Contract value                         :           Tk. 16.5 million. (ADB Financed).

 

            Year of completion                 :           May, 1991.

 

Execution period                     :           December, 1989 to May 1990.

 

 

C. RAILWAY BRIDGE:

 

C1.      Employer                                 :           BANGLADESH RAILWAY.

 

            Principal Contractor                :           SAMWHAN –TSO-JOINT VENTURE.

 

            Project                                     :           Construction of 30m long (without splice) Pre-cast

RCC Driven Piles for 33 Nos. of Bridge in Division- 1 & V on Bangabandhu Bridge Railway Link Project. Contract –1 at Tangail

 

            Contract Value                        :           Tk. 52,385,060.00 (Excluding cost of materials)

                       

            Contract Period                       :           16/12/97 to 26/06/2000

 

Completion Date                     :           20.06.2000

 

C2.   Employer                                    :           JAMUNA MULTIPURPOSE BRIDGE

PROJECT AUTHORITY.

 

        Principal Contractor                    :           SAMWHAN CORPORATION, KOREA.

 

        Project                                         :           Construction of  Bridges & Culverts on JMB

                                                            Approach Road, Contract –3 & Contract –4,

                                                            comprising.

                                                a)         Construction of 12 Nos. Double Cell Box Culverts

                                                            of 5m x 5.9 m x 2.

                                                b)         7 Nos. Single Cell Box culverts, 5m x 5.9m.

                                                c)         12 Nos. Slab Bridges, Span 31 m founded on

                                                            4mx4mx28.4m Pre-cast R.C.C single length driven

                                                            pile.

                                                d)         9 Nos. Slab Bridges, Span 66m founded on.4mx4

                                                            x 28.4m Pre-cast R.C.C. single  length driven pile.   

                         

            Contract value                         :           Tk.57 million (Excluding cost of cement,

                                                                        aggregates & Re-bar, Batch Plant, Transit mixers).

           

Contract period                       :           January 95 –June, 1997.

 

C3.      Employer                                 :           BANGLADESH RAILWAY  (WEST)

 

Project                                     :           Rebuilding of Railway Bridge No.20A at 

                                                            Shambhuganj, Mymensingh.  

Type of Foundation                :           106 cm diameter cast –in-situ R.C.C piles and 50.8

                                                            cm diameter cast –in-situ R.C.C piles in wingwalls  

 

            Contract value                         :           Tk. 9.65 million.

 

            Year of completion                 :           March, 1990.

 

Execution period                     :           March 1989 to March 1990

 

 

C4.      Employer                                 :           BANGLADESH RAILWAY

 

Principal Contractor                :           DAEWOO CORPORATION.

 

Project                                     :           Railway Workshop at Parbatipur.

                       

Type of Foundation                :           450 mm diameter 18-24 m long bored cast –in-situ

                                                            R.C.C piles (925 numbers)

            Contract value                         :           Tk. 23.2 million.

           

            Contract Period                       :           Sept 1989 to March 1990      

 

            Year of completion                 :           February, 1990.

                                                                        (All piles were tested for integrity by pile integrity tester)

 

C5.      Employer                                 :           BANGLADESH RAILWAY  (West)

 

Project                                     :           Rebuilding of Railway Bridge No.20, in

                                                            Ishurdi-Sirajganj Section.

                                   

Type of Foundation                :           42” dia Cast –in-situ R.C.C Piles & 24” diam. Rake 

                                                            Piles.

 

            Contract value                         :           Tk. 9.50 million.

 

            Year of completion                 :           1989

 

Execution period                     :           March 1989 to October  1989

 

C6.      Employer                                 :           BANGLADESH RAILWAY 

 

Project                                     :           Rebuilding of Bridge No. 42 (Turag DN) in

                                                            between DACT. TGI Station.

                                   

Type of Foundation                :           42” dia 70’ –0” long Cast –in-situ R.C.C Piles

                                                            Construction of 2 piers & 1 Abutment with wing

                                                            walls.

 

            Contract value                         :           Tk. 9.75 million.

 

            Year of completion                 :           1989

 

Execution period                     :           January 1989 to May 1989.

 

 

 

 

 

C7.      Employer                                 :           BANGLADESH RAILWAY 

 

Project                                     :           Rebuilding of Bridge No. 119 in between Shat

                                                            Khamair & Kawraid Stations.

                                   

Type of Foundation                :           36” dia 70’ –0” long Cast –in- situ R.C.C Piles.

 

            Contract value                         :           Tk. 3.6 million.

 

            Year of completion                 :           1987

 

Execution period                     :           January 1986 to September 1987.

 

 

C8.      Employer                                 :           BANGLADESH RAILWAY (EAST)

 

Project                                     :           Bridge No. 207 on Feni –Laksham Section.

 

Type of Foundation                :           42” diam 75 ft. long 70 Nos. Cast –in-situ R.C.C.

                                                            Piles.   

 

            Contract value                         :           Tk. 10.4 million.

 

            Year of completion                 :           1979

 

            Execution period                     :           October 1978 to January 1979.

 

 

 

D.        SILO:

 

D1.      Employer                                 :           CHITTAGONG CEMENT CLINKER

GRINDING CO. LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

                       

            Project                                     :           Construction of one 25,000 ton capacity 30m diam

                                                                        38.5 m high Clinker Silo of pre-stressed concrete

construction using SLIP FORM at Chittagong.

 

            Contract value                         :           Tk. 62.8 Million.

 

            Contract period                       :           15/02/2001 to 15/02/2002

 

 

 

 

 

 

D2.      Employer                                 :           ASHUGONJ CEMENT INDUSTRIES LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of Cement Mill Building, Packing

Building, Cement Silo, Clinker Silo, Gypsum Storage, Jetty and Conveyor for Ashugonj Cement Industries Ltd. at Mongla Port Area, Mongla, Bagerhat.

 

            Contract Value                        :           Tk. 11,27,73,356.00

 

                Contract Period                       :           20/05/2000 to 20/07/2002

 

<