| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| The Loop |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Malibug End |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Rajarbug End |  |  |  | |
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Saidabad End |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Construction of 9m high reinforced earth wall for ramp |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Construction of 9m high reinforced earth wall for ramp |  |  |  | |
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Vibro-compaction of foundation for Ramp |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| A peer of the loop |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Contruction of the loop without interrupting  Trains or Vehicles |  |  |  | |
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Contruction of the loop without interrupting  Trains or Vehicles |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 1.9 km long Flyover at Khilgaon Rail and Road Intersection |  
| Construction of the Loop |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 450m long Arial Khan Bridge |  
| Lifting of Girder from Floating Platform |  |  |  | |
| 
 |  |  
|   | 
|  |  
| 450m long Arial Khan Bridge |  
| Transport of Girder |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 450m long Arial Khan Bridge |  
| A view from the shore |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 450m long Arial Khan Bridge |  
| The Bridge |  |  |  | |
| 
 |  |  
|   | 
|  |  
| 450m long Arial Khan Bridge |  
| Another View From Shore |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 450m long Arial Khan Bridge |  
| Completed Bridge |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Lafarge Surma Cement |  
| Construction of Jetty |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Lafarge Surma Cement |  
| Jetty and Access way |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Lafarge Surma Cement |  
| Cement Loading Jetty |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Lafarge Surma Cement |  
| Cement Loading Jetty |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Lafarge Surma Cement |  
| Access way |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Lafarge Surma Cement |  
| Construction of Foundation and other Facilities for Power Plant |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Lafarge Surma Cement |  
| Construction of Cooling Tower for Power Plant |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Feasibility Study for proposed Padma Bridge  |  
| Sub-soil investigation using Cone Penetration Test (CPT). |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Feasibility Study for proposed Padma Bridge |  
| Sub-soil investigation using Cone Penetration Test (CPT). |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Chittagong Clinker Grinding Factory |  
| Construction of 25,000 Ton 30m Dia 38.5 m Tall Cement Silo using SLIPFORM |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Chittagong Clinker Grinding Factory |  
| Construction of 2x5,000 Ton Cement Silo using SLIPFORM |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Design and Construction of Jetty, Silo Scan Cement Factory |  
| 73m x 14m Jetty with 8m x 72m catwalk with 120 Ton capacity Gantry Crane |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Design and Construction of Jetty, Silo Scan Cement Factory |  
| 40,000 Ton Clinker Silo |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Design and Construction of Jetty, Silo Scan Cement Factory |  
| 5000 Ton capacity, 31m high, 16m diameter silo constructed using SLIPFORM |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Cement Clinker Grinding Plant at Mongla |  
| Construction of 3x2,000 Cement Silo using SLIPFORM |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of Hyundai Cement Factory |  
| The Project |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of Hyundai Cement Factory |  
| Conveyor and Clinker unloading Crane |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of Hyundai Cement Factory |  
| Mill Building and Cement Silos |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of Hyundai Cement Factory |  
| Erection of Mill Building |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of Hyundai Cement Factory |  
| Construction of Jetty using on and offshore rotary drilling. |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 31m high 1,000,000 liter water reservoir in Maymenshing |  
|  |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Design Built Construction of 36500 sqm 11 stroried factory building for Sinha Yarn Dying |  
| 900mm diameter 51m deep pile foundation |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Medlar Garment Factory |  
| Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Medlar Garment Factory |  
| Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Medlar Garment Factory |  
| Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Medlar Garment Factory |  
| Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 3rd Buriganga Bridge |  
| Construction of 1200mm diameter 38m long drilled cast-in-situ piles by RCD method on River Buriganga, Dhaka. |  |  |  | 
| 
 |  |  
|   | 
|  |  
| 14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka |  
| Costruction of basement 2 |  |  |  | |
| 
 |  |  
|   | 
|  |  
| 14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka |  
|  |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur |  
| Piers and Girders |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur |  
| Piers and Girders |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur |  
| Girders and Abutment |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Finished Mill Building |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Finished Mill Building |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Finished Mill Building |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Finished Silo Foundation |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Finished Ball Mill Base |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Construction of Bin |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Costruction of Tunnel and Bins |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Construction of underground tunnel (-7m) |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Construction of underground tunnel |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |  
| Costruction of Mill Building. |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |  
| Borehole Drilling |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |  
| Borehole Drilling |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Costruction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |  
| Night time Borehole Drilling |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |  
| Borehole Drilling |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |  
| PDA Test using 10MT Drop Hammer |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |  
| PDA Test using 10MT Drop Hammer |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of 420 nos 600mm dia RCC shore piles for Grameenphone CHQ Project, Dhaka |  
| Costruction of shore piles |  |  |  | |
| 
 |  |  
|   | 
|  |  
| 800MT Static Maintained Load Test for LGED, Kanaighat, Sylhet |  
| Load Test |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink |  
| Costruction of Tower Foundation |  |  |  | 
| 
 |  |  
|   | 
|  |  
| Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink |  
| Costruction of Tower Foundation |  |  |  | |
| 
 |  |  
|   | 
|  |  
| Drilling and Installation of 18inch diameter (borehole) 550ft long deep tube well in Dhaka. |  
| Drilling of Well. |  |  |  |  |  | 
|  |